Wed 28 Oct 2026, 16:00
DISCOM templates
Kiranpath Solar · 1 template in use · documents, form fields and timelines per electricity company
Madhya Pradesh west (Indore)In use on 11 projects
Template v3 · updated Sep 2026Edit list
Feasibility9 working daysMedian · range 4 to 18 · last 8 applications
Inspection after the report4 working daysMedian · last 6
Who submitsInstallerOn the DISCOM portal · reference recorded here
Documents11
| Document | Comes from |
|---|---|
| Net-metering application form | filled from the project |
| Latest electricity bill | lead |
| Consumer ID and address proof | uploaded by sales |
| Single line diagram (SLD) | design package |
| DISCOM drawing set (PDF) | design package |
| Feasibility approval letter | DISCOM |
| Module and inverter datasheets | equipment database |
| DCR certificate for the modules | supplier, with the PO |
| Installation photos | crew job card |
| Work completion report | filled from the as-built |
| Commissioning report | DISCOM, after inspection |
Form fields16
| Field | Filled from |
|---|---|
| Consumer name, address, phone | lead |
| Consumer number, tariff category | bill photo |
| Phase | site visit |
| Sanctioned load | customer |
| Meter number | customer's meter photo |
| Plant capacity, modules, inverter | approved design |
| SLD and drawing set | design package |
| Installer and vendor registration | settings |
| Property proof, latest bill | lead |
Rule: capacity above the sanctioned load adds a load enhancement request (editable)
Common rejection reasons checked on every claim5
Name on the bill matches the name on the national portal
Capacity in the application matches the commissioning report
Module make and serials on the DCR certificate match the goods receipt
Installation photos carry location and date
Consumer bank details present on the national portal
Other templates available3
MaharashtraAdd
GujaratAdd
RajasthanAdd
Ask for another DISCOM