Wed 28 Oct 2026, 16:00
Stages
Kiranpath Solar · one project record: sales board, then the build, with grid and subsidy beside it
A person moves each stage; a full readiness checklist never moves a card on its own.
DiscardSave stages
Sales boardLeads · owner is the salesperson
1Inquiry
2Site visit
3Proposal sent
4Negotiation
Ends in
WonStarts the build
LostNeeds a reason
BuildProjects · same id, same record
1EngineeringDesign approved
2MaterialsAll received
3InstallJob card done
4CommissioningSwitched on
5HandoverPack sent
Ends in
MonitoringService requests stay open
Grid and subsidyRuns beside the build from design approval
Template1Applied
2Feasibility
3Completion report
4Inspection
5Net meter
6Subsidy
Steps come from the DISCOM template
Where today's statuses goThe 13 statuses in today's project list, plus Lost, in their current order
Applied when you save| # | Status today | Category today | New stage | Board or track | |
|---|---|---|---|---|---|
| 1 | Customer Inquiry | Pre Sales | Inquiry | Sales | |
| 2 | Appointment/Consumer | Pre Sales | Site visit | Sales | |
| 3 | Site Assessment | Pre Sales | Site visit | Sales | |
| 4 | Engineering Design | Pre Sales | Site visit proposal in design | Sales | |
| 5 | Proposal Shared | Pre Sales | Proposal sent | Sales | |
| 6 | Quotation Shared | Pre Sales | Negotiation | Sales | |
| 7 | Permit Submission | Post Sales | Engineering and Applied | Build, grid and subsidy | |
| 8 | Grid Connection Approval | Post Sales | Materials and Feasibility | Build, grid and subsidy | |
| 9 | Material Delivery | Post Sales | Materials | Build | |
| 10 | Installation | Installation | Install | Build | |
| 11 | Inspection | Installation | Commissioning and Inspection | Build, grid and subsidy | |
| 12 | Commissioning | Installation | Commissioning | Build | |
| 13 | Monitoring/Won | Installation | Monitoring after Handover | Build | |
| – | Lost | – | Lost | Sales |