SurgePV · Lead to handover · short version · updated 28 Oct 2026

Run a rooftop job in SurgePV from the first call to handover, without re-typing it at each step

For Indian installers who today keep leads in WhatsApp, purchase in Excel and installation in a crew group. The idea: a lead is the early stage of a project, so one record carries the sold design from the call to the commissioning report. Engineering can be done in-house or ordered from Heaven Designs inside the same project. There are two portals: the installer's, and one for the homeowner. Procurement becomes a platform where manufacturers sell direct and pay SurgePV a commission.

How it works

  1. Work the lead. Pooja sees 4 follow-ups on her phone and 24 open leads on the pipeline board. Vikram Bhosale accepts proposal v2 (5.4 kWp, ₹3,02,400) on a call.
  2. Mark it won. She picks the accepted proposal and records the ₹60,480 advance. The same record, KP-1042, moves into delivery. Subsidy (₹78,000) stays separate from the price.
  3. Choose the engineering path. In-house in the studio, or a Heaven Designs permit-ready pack for ₹2,950 + GST, due next working day. Survey photos, bill and the sold design go with the request automatically.
  4. Answer questions, review the package. Heaven Designs asks about a water tank; the crew lead answers with a photo and the clock pauses. The pack arrives with two options; because it differs from what was sold, Vikram re-approves option A in his homeowner portal before anything is bought.
  5. Buy from the design. The approved design becomes a 9-line buy list: 7 to buy (estimate ₹1,98,500), 2 from the store. One request for quotes goes to 3 suppliers. A sponsored direct offer from Vardhan PV, a module maker, sits on the modules line, labelled and not pre-selected.
  6. Compare like with like. The cheapest-looking quote is missing 2 lines and adds freight. Malwa is complete at ₹1,95,500, but modules direct from Vardhan plus Malwa's other 6 lines come to ₹1,89,500, ₹6,000 less. Nikhil approves two POs, ₹2,06,528 with GST. Deliveries are received against them: 1 earthing kit short (closed next day) and 12 of 12 module serials scanned. Vardhan pays SurgePV 2% (₹2,628) on its order.
  7. Plan and install. The project plan holds DISCOM net-metering, inspection, subsidy and payment milestones. Crew A is scheduled Tue 10 to Wed 11 Nov; Raju gets a phone job card with the photos to take.
  8. Keep the homeowner in the loop. Vikram's portal shows the stage, what he must approve or pay (70% ₹2,11,680 once material is in), installation day, net meter and subsidy steps.
  9. Hand over. Serials are reconciled against the design, the as-built revision is recorded, the handover pack goes on WhatsApp, the last ₹30,240 is invoiced and the project moves to monitoring.

What it is and isn't

What's in it
  • One pipeline; manual stage moves with readiness hints
  • Won to project without a new record
  • Heaven Designs request, questions, delivery and review
  • Customer re-approval when the design changes
  • Buy list, request for quotes, compare, PO with approval, goods receipt
  • Project plan, DISCOM and subsidy paperwork, crew week, phone job card, handover
  • Homeowner portal: status, approvals, payments, documents
  • Sponsored direct offers from manufacturers, paid by commission on orders
Not in this version
  • Collecting payments or e-sign (the CRM outline excludes both; payments are recorded only)
  • Accounting, stock valuation, a full ERP (export to Tally or the ERP instead)
  • Monitoring after handover (separate roadmap item)
  • State-specific DISCOM forms
  • EPC companies and ground-mounted projects: a different flow by company size; a later variant

Release order

PhaseWhat ships
APipeline board, lead page, mark as won into a project, project overview. This is the CRM work already scoped.
BHeaven Designs request inside the project: place, message, deliver, review, customer re-approval. Opens services revenue from software customers.
CBuy list from the approved design, CSV export, then request for quotes, compare and PO.
DProject plan with DISCOM and subsidy milestones, crew week, phone job card, handover. Homeowner portal alongside.
ESponsored direct offers: one or two module and inverter makers, commission on orders, manufacturer results page. Needs enough order volume on SurgePV first.

Still to decide