Choose your design
Sent by Pooja on Thu 29 Oct, 18:40 · Design revision B
Step 2 of 6Final design
Why there are two options
Roof plan: 12 panels, tank south-west
The water tank on the south-west corner of your roof casts a shadow in the afternoon. With 12 panels, one panel sits partly in that shadow. You can keep all 12 panels, or drop that one panel and avoid the shade.
Either way the panels sit on a raised steel frame, 1.2 m high at the low end, so the roof stays usable and the tank stays reachable.
What happens after you approve
Your approval is saved with the time and the design version, and Pooja is told.
We order the materials. They take about a week to reach us.
We ask for the 70% payment when the materials arrive, and give you the installation date.
Approve option A
Not sure? Call Pooja first
Approving here is the same as saying yes to Pooja on a call.